The next day Dave then installed the electrics, and ran the cable from a convenient RCD in the garage to a separate RCD adjacent to the air pump, which was installed close to the septic tank and the new outlet point.
On morning three installing the PP treatment unit into the existing septic tank, connecting up the air pipe and starting the unit completed the installation.
All worked smoothly, the septic tank is now at a level which allows correct sewer drainage, the tank contents are being treated, and discharged to the soakaway (which can also be an adjacent ditch or watercourse subject to consents). |
 |